日本亚洲精品成人-日本亚洲精品色婷婷在线影院-日本亚洲欧美国产日韩ay高清-日本亚洲欧美美色-久久久久国产-久久久久国产精品

Industry News
Location: Home>> News>>Industry News

Paper cup machine operation procedure

2022-07-18 14:50:54
0

is the norm for employees to < strong>Paper cup machine operation process, prevent the occurrence of safety and quality accidents, and ensure the smooth progress of production work, formulate this operation process:

1. Preparations before starting:

1. Before taking over the shift, the successor should receive the paper, cup bottom, carton, sealant, silicone oil and other materials required for the day, and check the received materials and the amount of materials remaining in the work, and report any problems in time.

2. Turn on the power button of the console, check whether the power of the machine is normal, and whether the set temperature can reach the predetermined value.

3. Add a small amount of lubricating oil to the moving parts of the machine for lubrication, and wipe the parts that the product needs to contact to avoid pollution. At the same time, check whether the connecting screws and jack screws of the running parts of the machine are loose.

4. Check the flatness of the paper, whether there are peeling, spots, front and rear confusion, wrinkling and other phenomena.

5. When necessary, spray an appropriate amount of water on the paper, and strictly control the time and humidity of the paper.

6. Check the air pressure valve and adjust it to the required pressure value according to regulations.

7. Put the bottom paper on the cup, pay attention to the front and back.

paper cup machine

2. Work when starting production:

1. After the preparatory work is completed, when starting the motor, shout to start without any response. (This is to prevent the operator from being invisible when repairing on the opposite side or behind the machine, causing unnecessary safety accidents).

2. Carefully observe the operation of the machine, take a cup to check the bonding effect of the paper cup, preheat, main heat, whether the knurling is yellow, and the paper cup is damaged.

3. Check the bonding effect of the bonding place, whether there is any indirect defect, the bonding firmness between the bottom of the cup and the bonding is tearing and pulling, and the indirect non-swabbing is a suspected leaking cup, which is subject to the water test.

4. During normal operation, if you find or feel that the machine is abnormal, you should lift the cup body first, and stop the inspection after the last cup is knurled.

5. If the machine is stopped unexpectedly in the middle, when the machine is restarted for a long time, take out the fourth .5 piece in the market and check whether the knurled part is bonded.

6. Paper Cup MachineThe operator should pay attention to the cup mouth, The shape of the cup body and the bottom of the cup, and the adhesion and size appearance of the cup body are checked from time to time.

7. If employees concentrate their energy during the operation and find abnormal sound or the bottom of the cup is poorly formed, they should stop the machine immediately to check to avoid greater losses.

8. Operators should be conscientious and responsible in the production process, and test the cups produced by themselves with boiling water every hour, 8 cups each time.

9. Before sealing the carton, the operator should conduct a sampling inspection of the number of small packages. After the sampling inspection is correct, cut out the product certificate or product pattern, paste it on the upper right corner of the left side of the carton, fill in the work number and production date in the box, and finally stack the sealed boxes neatly in the designated position.

3. Work after shutdown:

1. Turn off the power of the console, cut off the main power, close the air valve and the silicone oil valve.

2. Clean up residual paper scraps inside and outside the machine, and clean up auxiliary tools such as water spray guns.

3. Organize the work environment, clean and keep the equipment clean.

other:

1. Keep in mind the idea of safety first, and strictly follow the paper cup machine operating procedures operation, illegal operation is strictly prohibited.

2. Fill in the shift record form carefully before handover.

Tags

Dongguan Hongxin Machinery Manufacturing Co., Ltd.

Phone:13590316866 

Email:fullsailchina@163.com

Address:No. 9 Taicheng Road, Shajiao Community, Humen Town, Dongguan City, Guangdong Province

WeChat

主站蜘蛛池模板: 美女天天操| 欧洲另类一二三四区| 天天操视频 夜夜| 免费人成在线观看69式小视频| 中国xxnxx免费| 性xxx欧美| 久久午夜免费视频| xxxxxx欧美| 成人免费一级片| 久久99精品这里精品动漫6| 欧美日韩国产免费一区二区三区| 美女色黄| 揉大乳gif动态图| 日韩精品亚洲专区在线观看| 欧美在线播放成人免费| 亚洲区小说区图片区qvod伊| 男女日批视频在线观看| 男人日批视频| 一本大道香蕉高清视频在线| 欧美在线精品一区二区三区 | 草草线在成人免费视频| 成年男女免费视频网站| 在线观看国产精品麻豆| 狠狠躁夜夜躁人人爽天天天天| 欧美视频网站免费看| 国产成a人片在线观看视频99| 国产成人短视频| 成人黄18免费视频| 久久午夜国产片| 性亚洲| 久草久草视频| 日日摸夜夜摸狠狠摸97| 亚洲动漫第一页| 日韩在线2020专区| 91精品欧美成人| 黄色一级片观看| 久久天天躁狠狠躁夜夜中文字幕| 免费看一级黄色大片| 男生插女生阴道视频| 一级性黄色| 性欧美videofree另类|